but the coarseness of the blade was too severe and as a finer one was mega expensive Mike has cut them all by hand ...
The cabin is now complete and as the rove set has now arrived it will be full steam ahead with the copper nails and roves.
We had a problem with the sides of Crocus moving outwards and the doors not meeting so an extra wide rib has been fitted just inside the cabin ...
Once completely secured then the bottlescrew and wire can be removed and hopefully this problem will not occur again.
Tuesday, 30 June 2009
Ribs
The most important work which has been happening over the last few weeks is the cutting and fitting of extra ribs. Not wanting to take out any of the current ribs, Mike decided to add new ones next to the existing ones and once they are fixed in place they will also be attached by tape and epoxy resin to give added strength. The circular saw was used at first to cut them ...
Friday, 1 May 2009
Stem
When the bowsprit was taken off Crocus and the gammon iron removed we were left with over-size holes that needed to be filled so that when her new bowsprit and gammon iron are fitted the screws will have something to bite on. The old holes were plugged ...
and then the excess was removed and made tidy ...
Tuesday, 21 April 2009
Change of Plans
After much measuring and re-measuring we've decided that it would be impossible to fit a full gas cooker into Crocus. So it was back to the drawing board and the new plans are this ...

Removing the cooker from the cabin means that we can now have a cool box and extra storage in its place. Once the decision was made we were back online to find a two-burner hob and grill which will go in the locker where the original one had been. We found a very good price for a Plastimo Neptune 2500 and so we immediately placed an order and it arrived very promptly ...

Removing the cooker from the cabin means that we can now have a cool box and extra storage in its place. Once the decision was made we were back online to find a two-burner hob and grill which will go in the locker where the original one had been. We found a very good price for a Plastimo Neptune 2500 and so we immediately placed an order and it arrived very promptly ...Saturday, 4 April 2009
Filling
Thursday, 2 April 2009
Gas Locker
The interior design for Crocus is such that the gas bottle locker has to be moved from the foredeck and will be re-housed in an aft locker. In order to give us six foot berths we need to have trotter boxes and the port side was blocked by the gas locker.
The hatch cover of the locker ...
and the gas bottle locker itself ...

Locker now removed ...
Gas vent before and after ...

The hole in the hull has been plugged and filled and the hole in the foredeck will be repaired and finished when the decks are covered.
The hatch cover of the locker ...
Tuesday, 17 February 2009
Plan View
Wednesday, 19 November 2008
Still Scraping!
I know it's a while since I've posted anything on here but it doesn't mean that nothing has been happening.
Every time that the weather has permitted it Mike has been out scraping away at all the layers of paint on her hull. It's a slow job but he's getting there!
Every time that the weather has permitted it Mike has been out scraping away at all the layers of paint on her hull. It's a slow job but he's getting there!
We noticed a problem when we first saw Crocus ...
It would appear that she had been left with her roof up and it had been slowly pushing the hull outwards so that the doors didn't meet to shut.
Since we've had her in Cornwall we've kept the roof down and the doors seemed to be better. Mike had an idea for bringing them in the last little bit and he fitted a bottlescrew and wire across inside the cabin ...
He's been very slowly tightening it over the weeks. What a difference ...